Four current specialty builds - mini cigarette-lighter adapters and open-end cable assemblies - plus full ODM development for anything that is not in the catalogue.
Most custom requests fall into three buckets: a standard build with your logo and packaging, a standard build with a changed connector or length, and a genuinely new assembly that needs its own tooling. The first is a print job, the second is a re-quote, the third is a development project. Only the third needs engineering time booked, so it is worth being explicit about which one you are asking for. The RFQ guide lists what to send with each type, and the MOQ guide explains where the volume thresholds come from.
An open-end, or bare-wire, assembly is the most common specialty request: cut to length, strip and tin, connector on one end, terminate the other into your device or enclosure. That is a routine build for us and needs no mold at all. One of the four items in this category exists for exactly that purpose.
For a new over-mold, budget the tooling and a T1 sample round before committing to a launch date. Tooling typically runs two to three weeks and the first shot usually needs one revision. A supplier quoting a firm launch date without a sample round is guessing, and the guess lands on your retail calendar rather than theirs. Packaging usually runs in parallel - see the packaging options guide.
| Request | What changes | Lead time added |
|---|---|---|
| Logo + packaging | Print, insert, box | 5-7 days |
| Connector or length change | Re-quote, new BOM | 7-10 days |
| New over-mold tool | Tooling + T1 sample | 3-5 weeks |
| Full ODM assembly | Design, tooling, validation | 6-10 weeks |
Times are added to the standard production window, not instead of it. Ask for both figures in the quotation.
Quick answers for OEM and wholesale cable buyers.
Send us a drawing, a sample photo or your target specification — our engineers will develop the right cable for your market.